top of page

DAUNTLESS
LAUNCHING IN 2023
LESS THAN A
30 DAY CYCLE:
BUILD. INTEGRATE. LAUNCH READY
Our engines are easily scalable and can be rapidly produced, typically within only 1-2 days, enabling us to target a recurring build, integrate, and launch-ready cycle in less than 30 days
With the inaugural launch of our Dauntless vehicle set for 2023, Vaya Space will be equipped to offer launch services to commercial and federal entities.
VEHICLE HEIGHT:
35 M
PAYLOAD CAPACITY:
1000+ KG LEO
600+ KG SSO

STAGE 1 DIAMETER: 2.5M
STAGE 2 DIAMETER: 2.15M
FAIRING: 2.15M
Powered by the Vortex-Hybrid Engine, the Dauntless Launch Vehicle is capable of sending more than 1000kg of payload into low earth orbit, and more than 600+ kg to sun synchronous orbit.

bottom of page